Multinational inspection of AREVA NP in its Creusot Forge plant in Le Creusot (France)

Published on 27/02/2017 at 12:00

Information notice

With regard to the irregularities detected at Creusot Forge in early 2016, which affect forgings installed in the nuclear reactors of various countries, a multinational inspection of AREVA NP took place from 28th November to 2nd December 2016, in its Creusot Forge plant in Le Creusot (71), in accordance with the inspection protocol of the Multinational Design Evaluation Program (MDEP). This inspection, led by ASN, involved inspectors from the American, British, Canadian, Chinese and Finnish safety regulators, who used the Quality Assurance / Quality Management Criteria for Multinational Vendor Inspection baseline requirements detailed in MDEP technical report TR-VICWG-03 of 30th January 2014.

The aim of this inspection was to examine the review method for the component files already assessed and those currently undergoing assessment and to examine the organisational and technical changes, as well as the changes in terms of quality and nuclear safety culture implemented within the Creusot Forge plant.

Find out more

  • Inspection of nuclear pressure equipment (ESPN) manufacturing
    Multinational inspection – Creusot Forge plant
    Inspection from 28th November to 2nd December 2016 

Date of last update : 03/09/2021