Generic guidelines for the periodic safety review associated with the fourth ten-yearly outages of the 900 MWe reactors

Published on 23/04/2016 at 13:11

Information notice

In a letter dated 20 April 2016, ASN stated its position regarding the EDF guidelines file concerning the 4th periodic safety review of the 900 MWe nuclear reactors.

This fourth periodic safety review represents a highly singular context in three respects:

  • First of all, forty years of operation corresponds to the initial hypothesis used in the design of certain reactor components and equipment. Extending their operation beyond this period means that these design studies must be updated to take account of operating experience feedback.
  • Next, this fourth periodic safety review is an opportunity to complete the integration of the changes arising from the ASN prescriptions issued following the stress tests performed in the wake of the accident that struck the Fukushima-Daiichi nuclear power plant in Japan.
  • Finally, in 2009, EDF stated that it wished to significantly extend the operating life of the reactors beyond 40 years, which implies reassessing their safety in the light of the requirements applied to new facilities, the state of the art with regard to nuclear technologies and the operating life targeted by EDF.

Given the particular context of this fourth periodic safety review of the 900 MWe plant series, which aims to ensure continued operation beyond 40 years, ASN wanted to encourage greater stakeholder participation as of the generic preparation phase. This position statement was thus opened up to public consultation on the Internet from 26 January to 16 February 2016. All the comments received during this consultation are collated in a downloadable synthesis.

After examination, ASN considers that the topics selected by EDF in its programme correspond to the safety issues. However, ASN asks EDF to supplement several aspects of its programme, more specifically with regard to the scope of the inspection programmes and the study improvement objectives.

Following the generic studies phase, ASN will also issue a position statement on the adequacy of the modifications planned by EDF.

The first ten-yearly inspection associated with this fourth periodic safety review for the 900 MWe reactors is scheduled as of 2019 (Tricastin 1 reactor).