IAEA IRRS mission 2014

The French nuclear safety and radiation protection oversight system evaluated by IAEA

Published on : 22/01/2015

Time length : 04:48

Description

At the request of ASN, an “Integrated Regulatory Review Service” (IRRS) international peer review mission took place from 16th to 28th November 2014. , This audit looked into all the activities regulated and monitored by ASN. It was held in accordance with the European directive on nuclear security, which requires a peer review mission to be organised every 10 years.

Keywords

Type of video

Localisation

Autorité de sûreté nucléaire

15, rue Louis Lejeune
92120 Montrouge

Learn more

28 November 2014

Le système français de contrôle de la sûreté nucléaire et de la radioprotection évalué par l'AIEA

L’ASN a accueilli du 17 au 28 novembre 2014 une mission AIEA de revue par les pairs.

28 November 2014

The French nuclear safety and radiation protection oversight system was evaluated by IAEA

From 17th to 28th November 2014, ASN hosted an IAEA peer review mission. This Integrated Regulatory Review Service (IRRS) mission concerned all the activities monitored and regulated by ASN. It examined the strengths and weaknesses of the French nuclear safety and radiation protection oversight system with respect to IAEA safety standards.

Les audits de l'AIEA en France

IRRS, OSART, TranSAS.

L'Agence internationale de l'énergie atomique (AIEA)

Créée en 1957, l'AIEA a pour mission de promouvoir l'utilisation sûre des technologies nucléaires à des fins pacifiques. C'est une organisation de la famille des Nations unies qui regroupait, en janvier 2014, 161 États membres.

See as well

09 December 2014

Mission IRRS - ASN / AIEA - nov. 2014

Conférence de presse de P.-F.Chevet (ASN), M. Satorius (NRC / AIEA) et J.L. Lyons (AIEA)

Date of last update : 29/01/2015