On 21 October 2021, following ultrasonic inspections performed during the ten-yearly outage inspection of the Civaux NPP, EDF informed ASN that it had detected indications on welds on the elbows of the pipes connecting the safety injection system to the reactor’s main primary system. In order to identify the origin of these indications, the parts of the pipes concerned were cut for metallurgical analysis in the laboratory.