2009
-
Information notice No.5: ASN keeps a close watch on construction work ...
02/12/2009 5:50 pm
Information notice No.5: ASN keeps a close watch on construction work on the future Flamanville 3 reactor
Information notice No.5: ASN keeps a close watch on construction work on the future Flamanville 3 reactor
-
Flamanville 3 : ASN keeps a close watch on construction work on the future Flamanville 3 reactor (newsletter n°5)
02/02/2009 12:00 am
Flamanville 3 : ASN keeps a close watch on construction work on the future Flamanville 3 reactor (newsletter n°5)
During the last quarter of 2008, ASN continued its inspection activities on the construction site of the Flamanville 3 EPR.
-
Inauguration of an English version of the www.asn.fr website
01/28/2009 12:00 am
Inauguration of an English version of the www.asn.fr website
ASN is opening a website in English. It can be consulted either from the French site or directly at http://www.french-nuclear-safety.fr.
-
ASN independence: enhanced regulation and transparency
01/20/2009 12:00 am
ASN independence: enhanced regulation and transparency
To usher in the new year, the French Nuclear Safety Authority (ASN), in the person of Mr André-Claude Lacoste, Chairman, Mr Marc Sanson, commissioner, and Mr Jean Christophe Niel, Director General, presented its best wishes to the press on 20 January.
-
ASN – vigilant surveillance of radioactivity in the environment
01/13/2009 12:00 am
ASN – vigilant surveillance of radioactivity in the environment
With a view to advancing nuclear regulation in France, ASN brought in an approval procedure on 1 January 2009 for laboratories measuring radioactivity in the environment.
-
Information notice No.3: ASN authorises the resumption of concrete pouring ...
06/19/2008 5:46 pm
Information notice No.3: ASN authorises the resumption of concrete pouring work on the EPR site
Information notice No.3: ASN authorises the resumption of concrete pouring work on the EPR site