2009
-
The French Nuclear Safety Authority (ASN) evaluated by 12 international experts coordinated by the AIEA
05/04/2009 12:00 am
The French Nuclear Safety Authority (ASN) evaluated by 12 international experts coordinated by the AIEA
The French Nuclear Safety Authority (ASN), at its request, had an “Integrated Regulatory Review Service” (IRRS) international audit mission conducted from 29 March to 3 April 2009.
-
Report on “the status of nuclear safety and radiation protection in France in 2008” to the OPECST.
05/04/2009 12:00 am
The French Nuclear Safety Authority (ASN) has presented its report on “the status of nuclear safety and radiation protection in France in 2008” to the OPECST.
The French Nuclear Safety Authority (ASN) intends to carry on raising the level of nuclear safety in France in 2009
-
Quarterly report of ASN/SFRO level 1 radiotherapy events reported during first quarter 2009
04/30/2009 12:00 am
Quarterly report of ASN/SFRO level 1 radiotherapy events reported during first quarter 2009
Since 1 July 2008, events classified as level 1 on the ASN/SFRO scale are summarized in a general quarterly report that ASN (French Nuclear Safety Authority) publishes on its website.
-
Quarterly statement of radiotherapy events reported to ASN
04/21/2009 12:00 am
Quarterly statement of radiotherapy events reported to ASN, classified as Level 1 on the ASN-SFRO (French Nuclear Safety Authority - French Society of Radiation Oncology) scale - 4th quarter 2008
Events after 1st July 2008, classified as level 1 on the ASN-SFRO scale and which ASN initially reported via the incident report system, are summarised in an overall quarterly statement which was published on the ASN Internet site.
-
ASN Classifies Melox Incident as INES Level 2
03/19/2009 12:00 am
ASN Classifies Melox Incident as INES Level 2
The French nuclear safety authority (Autorité de Sûreté Nucléaire, ASN) has classified an incident at Areva NC’s Melox mixed-oxide fuel fabrication plant at Marcoule in southern France as level 2 on the International Nuclear Event Scale (INES).
-
Information notice No.5: ASN keeps a close watch on construction work ...
02/12/2009 5:50 pm
Information notice No.5: ASN keeps a close watch on construction work on the future Flamanville 3 reactor
Information notice No.5: ASN keeps a close watch on construction work on the future Flamanville 3 reactor
-
Flamanville 3 : ASN keeps a close watch on construction work on the future Flamanville 3 reactor (newsletter n°5)
02/02/2009 12:00 am
Flamanville 3 : ASN keeps a close watch on construction work on the future Flamanville 3 reactor (newsletter n°5)
During the last quarter of 2008, ASN continued its inspection activities on the construction site of the Flamanville 3 EPR.
-
Inauguration of an English version of the www.asn.fr website
01/28/2009 12:00 am
Inauguration of an English version of the www.asn.fr website
ASN is opening a website in English. It can be consulted either from the French site or directly at http://www.french-nuclear-safety.fr.
-
ASN independence: enhanced regulation and transparency
01/20/2009 12:00 am
ASN independence: enhanced regulation and transparency
To usher in the new year, the French Nuclear Safety Authority (ASN), in the person of Mr André-Claude Lacoste, Chairman, Mr Marc Sanson, commissioner, and Mr Jean Christophe Niel, Director General, presented its best wishes to the press on 20 January.
-
ASN – vigilant surveillance of radioactivity in the environment
01/13/2009 12:00 am
ASN – vigilant surveillance of radioactivity in the environment
With a view to advancing nuclear regulation in France, ASN brought in an approval procedure on 1 January 2009 for laboratories measuring radioactivity in the environment.
-
Information notice No.3: ASN authorises the resumption of concrete pouring ...
06/19/2008 5:46 pm
Information notice No.3: ASN authorises the resumption of concrete pouring work on the EPR site
Information notice No.3: ASN authorises the resumption of concrete pouring work on the EPR site