Information notice

tip a friend Print add to favorite Updated, August 26 2010

In application of the Act on transparency and security in the nuclear field (TSN) of 13 June 2006, ASN defined by a decision of 26 September 2008 the prescriptions for the Flamanville 3 EPR reactor currently being built on the Flamanville site.

  • Instrumentation and control system of the Flamanville 3 EPR 08/24/2010 10:37 am

    ASN reports on its examination of the technical documentation on the instrumentation and control system of the Flamanville 3 EPR

    In order to improve the robustness of the instrumentation and control (I&C) system [1] of the EPR reactor, ASN asked EDF to modify one of the reactor’s control platforms. EDF had already considered this modification towards the end of 2009 in response to ASN’s request on 15 October 2009.

  • EPR Pressurised Water Reactor 11/02/2009 1:57 pm

    Joint Regulatory Position Statement on the EPR Pressurised Water Reactor

    Joint Regulatory Position Statement on the EPR Pressurised Water Reactor

  • Flamanville 3 : The ASN enacts prescriptions for the EPR 10/10/2009 11:00 am

    Flamanville 3 : The French Nuclear Safety Authority (ASN) enacts prescriptions for the EPR reactor being built at Flamanville in the Manche Department, France

    In application of the Act on transparency and security in the nuclear field (TSN) of 13 June 2006, ASN defined by a decision of 26 September 2008 the prescriptions for the Flamanville 3 EPR reactor currently being built on the Flamanville site.